◆Power
transformation project ◆Power
transmission project ◆Systems
engineering ◆Communication
engineering
Power
transformation project ▲Top
|
No.
|
Project
|
Capacity
|
Scope
|
Fulfill time
|
|
1
|
220kV Dalian First Power
Substation Reconstruction
|
180MVA×2
|
project consultation, survey and design
|
4.1996
|
|
2
|
220kV Chashan Power Substation
Reconstruction
|
120MVA×2
|
project consultation, survey and design
|
4.1994
|
|
3
|
220kV Songshu Power Substation
project
|
63MVA×1
|
project consultation, survey and design
|
4.1997
|
|
4
|
220kV Qingyun Power Substation
Reconstruction
|
180MVA×2
|
project consultation, survey and design
|
4.19964
|
|
5
|
220kV Wanbao Power Substation
Reconstruction
|
120MVA×2
|
project consultation, survey and design
|
4.1996
|
|
6
|
220kV Nanguanling Parallel Reactor Reconstruction
|
25MVA×3
|
project consultation, survey and design
|
10.1992
|
|
7
|
220kV Caotun Power Substation
Reconstruction
|
120MVA×2
|
project consultation, survey and design
|
7.1996
|
|
8
|
220kV Haiwan Power Substation
Reconstruction
|
120MVA×2
|
project consultation, survey and design
|
10.1999
|
|
9
|
220kV Zhonghua Road Power
Substation Reconstruction
|
120MVA×2
|
project consultation, survey and design
|
10.1995
|
|
10
|
220kV Gezhenbao Power
Substation Reconstruction
|
120MVA×2
|
project consultation, survey and design
|
12.2000
|
|
11
|
220kV Zhuanghe First Power
Substation Reconstruction
|
120MVA×2
|
project consultation, survey and design
|
7.2001
|
|
12
|
220kV Wutun Power Substation
Reconstruction
|
120MVA×2
|
project consultation, survey and design
|
7.2001
|
|
13
|
220kV Baiyu Power Substation
Reconstruction
|
120MVA×1
|
project consultation, survey and design
|
10.1998
|
|
14
|
220kV Dashihua Power Substation
Reconstruction
|
90MVA×2
|
project consultation, survey and design
|
9.2000
|
|
15
|
66kV Victory Square Power Transformation project
|
50MVA×2
|
project consultation, survey and design
|
7.1994
|
|
16
|
66kV Xinkai Road Power Transformation project
|
40MVA×2
|
project consultation, survey and design
|
3.1995
|
|
17
|
66kV Jinxiu Power Transformation
project
|
40MVA×1
|
project consultation, survey and design
|
5.1995
|
|
18
|
66kV Dagang Power Transformation
project
|
16MVA×2
|
project consultation, survey and design
|
8.1996
|
|
19
|
66kV Xinghai Bay Power
Transformation project
|
50MVA×2
|
project consultation, survey and design
|
6.1995
|
|
20
|
66kV Free Trade Zone
Power Transformation project
|
50MVA×2
|
project consultation, survey and design
|
5.1995
|
|
21
|
66kV Minshou Power Transformation
project
|
50MVA×2
|
project consultation, survey and design
|
3.1997
|
|
22
|
66kV Changxing Power
Transformation project
|
40MVA×2
|
project consultation, survey and design
|
12.1996
|
|
23
|
66kV Shicao Power Transformation
project
|
40MVA×1
|
project consultation, survey and design
|
7.1996
|
|
24
|
66kV Xingmin Power Transformation
project
|
40MVA×1
|
project consultation, survey and design
|
8.1996
|
|
25
|
66kV Xiaotaoshan Power
Transformation project
|
40MVA×1
|
project consultation, survey and design
|
6.1997
|
|
26
|
66kV Yandao Power Transformation
project
|
40MVA×1
|
project consultation, survey and design
|
1.1997
|
|
27
|
66kV Beiliang Power Transformation
project
|
31.5MVA×1
|
project consultation, survey and design
|
11.1999
|
|
28
|
66kV Houjiagou Power
Transformation project
|
40MVA×1
|
project consultation, survey and design
|
9.1998
|
|
29
|
66kV Chunhai Power Transformation
project
|
40MVA×1
|
project consultation, survey and design
|
9.1997
|
|
30
|
66kV Xinqitun Power Transformation
project
|
40MVA×1
|
project consultation, survey and design
|
11.1998
|
|
Power
transmission project ▲Top
|
No.
|
Project
|
Conducting wire
|
Scope
|
Fulfill time
|
|
1
|
220kV NanGang line
|
2×LGJ-300 two-way
|
project consultation, survey and design
|
9.2001
|
|
2
|
220kV HeNan A & B lines
|
2×LGJ-300 two-way
|
project consultation, survey and design
|
9.2001
|
|
3
|
220kV Wu Cao line
|
2×LGJ-240 two-way
|
project consultation, survey and design
|
9.2001
|
|
4
|
66kV Wushanhai connecting line reconstruction
|
LGJ-240×2
two-way
|
project consultation, survey and design
|
9.2001
|
|
5
|
66kV Ge connecting line northwest branch
|
LGJ-240,S=300 two-way cable
|
project consultation, survey and design
|
8.2001
|
|
6
|
220kV Henwu line reconstruction
|
2×LGJ-300 two-way
|
project consultation, survey and design
|
6.2001
|
|
7
|
66kV Fu three line reconstruction
|
LGJ-240 two-way
|
project consultation, survey and design
|
6.2001
|
|
8
|
66kV DanFu line cable
|
S=300 cable
|
project consultation, survey and design
|
11.2001
|
|
9
|
66kV
ShuiQing line Xinqitun branch
|
S=400
cable
|
project consultation, survey and design
|
7.2000
|
|
10
|
66kV FangTie line
|
LGJ-240 two-way
|
project consultation, survey and design
|
6.2000
|
|
11
|
66kV
ShuiYou line reconstruction
|
LGJ-300×2 two-way
|
project consultation, survey and design
|
4.2000
|
|
12
|
66kV BaoFu line
|
LGJ-240
two-way
|
project consultation, survey and design
|
9.1999
|
|
13
|
66kV
HaiXiang, XiangWang lines
|
LGJ-300×2 two-way
|
project consultation, survey and design
|
10.1999
|
|
14
|
66kV QingZhu line Chunhai Heat and Power Plant branch
|
S=300
cable
|
project consultation, survey and design
|
10.1999
|
|
15
|
66kV HaiSha line reconstruction
|
LGJ-240×2 two-way
|
project consultation, survey and design
|
9.1998
|
|
16
|
66kV
XinMing left and right lines Chengzitan branch
|
LGJ-240
two-way
|
project consultation, survey and design
|
5.1998
|
|
17
|
66kV HuaSheng and HuaZong lines
|
S=400 two-way cable
|
project consultation, survey and design
|
3.1998
|
|
18
|
66kV ChengMing line capacity increase project
|
LGJ-240 two-way
|
project consultation, survey and design
|
8.1997
|
|
19
|
66kV QingZhu left and
right lines
|
preceeding section
LGJ-300×2 two-way
following sectionS=400、800 cable
|
project consultation, survey and design
|
6.1997
|
|
20
|
66kV ShuiQing line Victory branch
|
S=400 cable
|
project consultation, survey and design
|
6.1997
|
|
21
|
220kV Songling power transmission
project
|
LGJ-70 one-way
|
project consultation, survey and design
|
5.1997
|
|
22
|
66kV Qingzhu line Minshou branch
|
S=300 cable
|
project consultation, survey and design
|
5.1997
|
|
23
|
66kV ReKai line
|
RST-290 high-temperature low arc line two-way
|
project consultation, survey and design
|
4.1997
|
|
24
|
220kV XiongBao line Songshu branch
|
LGJ-300 two-way
|
project consultation, survey and design
|
3.1997
|
|
25
|
66kV
MinGang line cable
|
S=400,S=800 cable
|
project consultation, survey and design
|
8.1996
|
|
26
|
220kV ShuiYun line reconstruction
|
2×LGJ-300 two-way
|
project consultation, survey and design
|
6.1996
|
|
27
|
66kV WuHong and WuFeng
lines
|
WuFeng LGJ-300 two-way
WuHong LGJ-240 two-way
|
project consultation, survey and design
|
6.1996
|
|
28
|
66kV ZhongJin linr
|
LGJ-240 two-way
|
project consultation, survey and design
|
6.1996
|
|
29
|
66kV HaiWang line Changxing branch
|
S=300 cable
|
project consultation, survey and design
|
5.1996
|
|
30
|
220kV HeWan, LianWan line reconstruction
|
LGJ-300 two-way
|
project consultation, survey and design
|
2.1996
|
Systems
engineering ▲Top
|
No.
|
Project
|
Scope
|
Fulfill time
|
|
1
|
Dalian Xinghai Bay Electric Programming
project
|
project consultation, feasible research and design
|
9.2001
|
|
2
|
Dalian Habor Ore Dock Power Transmission
and Transformation project
|
project consultation, feasible research and design
|
7.2001
|
|
3
|
66kV Mianhuadao Power Transmission and Transformation
project
|
project consultation, feasible research and design
|
6.2001
|
|
4
|
Changhaifeng Electric Plant project
|
project consultation, feasible research and design
|
6.2001
Beijing
|
|
5
|
220kV Labor Power Transformation
project & 66kV unite network project
|
project consultation, feasible research and design
|
22.1.2001
|
|
6
|
66kV Shuangke Power Transmission and Transformation project
|
project consultation, feasible research and design
|
12.2001
|
|
7
|
66kV Angang New Steel
Inc Power Transmission and Transformation project
|
project consultation, feasible research and design
|
12.2001
|
|
8
|
Electric network programming project
for Dalian Development Zone Tow-D Habor
|
project consultation, feasible research and design
|
1.2001
|
|
9
|
Power spply project for attracting
elites to Dalian
|
project consultation, feasible research and design
|
9.11.2000
|
|
10
|
66kV Shuangdao Power
Transmission and Transformation project
|
project consultation, feasible research and design
|
9.2000
|
|
11
|
66kV Wangjiagou Power
Transformation reconstruction
|
project consultation, feasible research and design
|
6.2000
|
|
12
|
66kV Huanan Power Transmission
and Transformation project
|
project consultation, feasible research and design
|
3.2000
|
|
13
|
Dahihua Heat and Power Plant reconstruction
|
project consultation, feasible research and design
|
10.2000
|
|
14
|
66kV Beiliang Power Substation
capacity increase reconstruction
|
project consultation, feasible research and design
|
8.1999
|
|
15
|
Development Zone Heat and Power Plant
second stage #4 machines network project
|
project consultation, feasible research and design
|
3.1999
|
|
16
|
66kV Wafangdian Power
Substation reconstruction
|
project consultation, feasible research and design
|
12.1999
|
|
17
|
Xianghai Heat and Power Plant connection
system engineering
|
project consultation, feasible research and design
|
10.1999
|
|
18
|
66kV West Suburb Power
Transmission and Transformation project
|
project consultation, feasible research and design
|
3.1998
|
|
19
|
Hengshanfeng Power Plant project
|
project consultation, feasible research and design
|
9.1997
|
|
20
|
Dashihua 66kV
system network project
|
project consultation, feasible research and design
|
12.1997
|
|
21
|
66kV Chunhai Power Transmission
and Transformation project
|
project consultation, feasible research and design
|
1.1997
|
|
22
|
66kV Xinqitun Power Transmission
and Transformation project
|
project consultation, feasible research and design
|
1.1997
|
|
23
|
66kV Changxing Power Transmission
and Transformation project
|
project consultation, feasible research and design
|
8.1996
|
|
24
|
66kV Minshou Power Transmission
and Transformation project
|
project consultation, feasible research and design
|
8.1996
|
|
25
|
66kV Yandao Power Transmission
and Transformation project
|
project consultation, feasible research and design
|
7.1996
|
|
26
|
66kV Xingmin Power Transmission
and Transformation project
|
project consultation, feasible research and design
|
12.1995
|
|
27
|
66kV Mingyang Power Transmission
and Transformation project
|
project consultation, feasible research and design
|
11.1995
|
Communication
engineering ▲Top
|
No.
|
Project
|
Scope
|
Fufill time
|
|
1
|
Wafangdian regional expanded frequency
communication
|
project consultation, survey and design
|
2002
|
|
2
|
Jinzhou regional expanded frequency
communication
|
project consultation, survey and design
|
2002
|
|
3
|
Pulandian regional expanded frequency
communication
|
project consultation, survey and design
|
2002
|
|
4
|
Yaojia Power Substation
|
project consultation, survey and design
|
2001
|
|
5
|
Xinhua and Wanbao Power Substation
|
project consultation, survey and design
|
2001
|
|
6
|
Fangjia and Tieshan Power Substation
|
project consultation, survey and design
|
2001
|
|
7
|
Lvshun and Dawu Power Substation
|
project consultation, survey and design
|
2001
|
|
8
|
Lianfeng Power Substation
|
project consultation, survey and design
|
2001
|
|
9
|
Shihe Power Substation
|
project consultation, survey and design
|
2001
|
|
10
|
Wangjiagou Power Substation
|
project consultation, survey and design
|
2001
|
|
11
|
Hongqi Power Substation
|
project consultation, survey and design
|
2001
|
|
12
|
Zhenli Power Substation
|
project consultation, survey and design
|
2001
|
|
13
|
Yingnahe Power Substation
|
project consultation, survey and design
|
2001
|
|
14
|
Shalitu Power Substation
|
project consultation, survey and design
|
2001
|
|
15
|
Dashihua 66kV
Power Substation
|
project consultation, survey and design
|
2001
|
|
16
|
Songshu and West Suburb Power Substation
|
project consultation, survey and design
|
2001
|
|
17
|
Wutun Power Substation
|
project consultation, survey and design
|
2001
|
|
18
|
Lieshishan Microwave Station
|
project consultation, survey and design
|
8.2000
|
|
19
|
Xinqitun Power Substation
|
project consultation, survey and design
|
2000
|
|
20
|
Sanyuan Power Substation
|
project consultation, survey and design
|
2000
|
|
21
|
Antigua
|
project consultation, survey and design
|
12.1999
|
|
22
|
Minzhu Power Substation
|
project consultation, survey and design
|
1999
|
|
23
|
Dafangshen Power Substation
|
project consultation, survey and design
|
1999
|
|
24
|
Chashan and Sanshilibao Power Substation
|
project consultation, survey and design
|
1999
|
|
25
|
Qingyun Power Substation
|
project consultation, survey and design
|
1999
|
|
26
|
Yandao Power Substation
|
project consultation, survey and design
|
1999
|
|
27
|
Wafangdian Control Building
|
project consultation, survey and design
|
11.1997
|
|
28
|
Guanzi Microwave Station
|
project consultation, survey and design
|
10.1997
|
all above
are specialized projects
|
|
|
 |